You run the job site. We do the admin.

A crew of AI agents takes over the site admin. Max follows up change orders, Remi writes the site reports, Bas keeps the crews on track. You just approve.

  • Max, Change orders
  • Remi, Site reports
  • Bas, Foreman
  • Lex, Legal
  • Penny, Finance, still in training

Residentie Park

All caught up
OverviewPunchlistsExtra workSite reportsInvoicesDisputesDossier

PunchlistsBas keeps track of this

New to-do
Elektro PeetersElectrical3Sanitair De SmetPlumbing2

Elektro PeetersResidentie Park · 3 to-dos

  • Substrate, upper floor
  • Sockets, classroom 2.04
  • Fit the cover plates

Punchlists · Bas keeps track of this

Residentie Park

All caught up
OverviewPunchlistsExtra workSite reportsInvoicesDisputesDossier

Latest from the siteSite report WV-08 · 3 pointsEverything from the site

Extra workMax follows this up

  • Plastering, upper floor€4,850 · ready to send
  • Suspended ceiling, canteen€5,900 · only agreed verbally
  • Extra light, storage roomThe Claes family · requested

PunchlistsBas keeps track of this

  • Elektro Peeters3 to-dos3
  • Sanitair De SmetReady to send2

Lex is watching ·Dispute: front windowsDeadline is today

Overview · the whole crew on one site

Residentie Park

All caught up
OverviewPunchlistsExtra workSite reportsInvoicesDisputesDossier

Extra workMax follows this up

Extra work
Open
Only approved verbally
Approved in writing

Requested

Extra light, storage roomThe Claes family

Sent

Plastering, upper floor€4,850

Under discussion

Suspended ceiling, canteen€5,900 · only agreed verbally

Extra work · Max follows this up

2 min
for a site report that’s ready to send, instead of 20
½ day
back every week for each project leader

Figures measured during our pilots · screen: sketch of the app

Works with the tools you already use

  • Microsoft
  • Google
  • Robaws
  • WhatsApp

Your project leaders are there to build. Not to spend evenings typing up reports.

That’s why our mission is to double the efficiency of construction teams, starting with project leaders.

  • Extras slip away. Agreed verbally on site, forgotten at invoicing.
  • Agreements disappear. Into WhatsApp groups, inboxes and notebooks.
  • No overview. Anyone who wants to know how a site is doing calls the project leader.

Meet the crew.

Each agent has one job and does it well. Four are at work today, Penny is still in training.

  • Max Change orders

    At work

    Catches every extra agreed on site, turns it into a quote and follows it up until it's billed.

  • Remi Site reports

    At work

    Turns a voice memo after the walkthrough into a report with action points, sent the same day.

  • Bas Foreman

    At work

    Sends punch lists to your subcontractors and follows up until every crew has reported back.

  • Lex Legal

    At work

    Watches deadlines, disputes and contract clauses, and tells you when something should be on paper.

  • Penny Finance

    In training

    Learning to check subcontractor invoices against your quotes and contracts, and to track your margin per site.

What you get.

Less money left on the table, disputes you can settle with evidence, every site in view, and project leaders back on site instead of behind a laptop.

  • MarginEvery extra priced and confirmed to the client the same day, so it gets billed.

  • SubcontractorsIn writing the same day, timing included.

  • Project leadersOne minute of talking after a site visit. We do the rest; they approve.

  • DisputesEvery agreement on record, timestamped. You settle it with evidence.

  • OverviewEvery site and every open extra in one view.

One site visit, three agents.

A project leader wraps up a walkthrough at Residentie Park. This is what happens next, without him opening a laptop.

Sixty seconds of talking. The report is ready.

In the car, before he drives off: what was discussed, what was decided, what’s still open. In the app or simply on WhatsApp. Remi puts it in the structure of your reports.

  • Voice note, email or photo as the source
  • In Dutch, French or English
  • Read it over, send it, drive on

The extra work, checked against the quote.

Plastering the top floor falls outside article 12.3. Max spots it, makes a first estimate from your rates and prepares the confirmation for the client.

  • Checked against quote, contract and specs
  • Prices come from you, never made up
  • Confirmed the same day, so it gets billed

The agreement with the electrician, in black and white.

No more “that’s not what we agreed.” Bas sends the agreement from your own mailbox, with the timing included, and puts it on the subcontractor’s punchlist.

  • Punchlists per subcontractor
  • Invoices checked against their own contract
  • Sent from your own mailbox

The file is up to date. Management sees every site.

The electrician’s report arrives in SharePoint, the client approves the extra by email. Bas and Max pick them up and file them, timestamped. Nobody has to call a project leader anymore.

  • Disputes settled with evidence
  • Every site and open extra in one view
  • Learns your rules, terms and margins

Your team keeps working the way it works.

Mail in Outlook, reports in SharePoint, voice notes on WhatsApp. We pick up whatever comes in and deliver back to where your team already works.

Comes in

  • Voice noteWhatsApp
  • Email from the clientOutlook
  • Site reportSharePoint
  • Subcontractor invoicepdf

Your agentschecked against your quotes, contracts, terms and margins

Goes out

  • Confirmationto the client
  • Punchlistto subcontractors
  • Extra-work quotepdf with your logo
  • Project fileupdated

How we work.

We work with a small group of construction companies with revenue between €5M and €100M that want to build alongside us as design partners in 2026. Twelve weeks, on your own projects, and at the end we show you what it delivered.

  1. Demo and setup

    Week 0

    • We show what we would take off your project leaders’ hands, on work like yours
    • We set up your rules, payment terms, margins and crews
    • With the pilot projects’ quotes and contracts, and the tools your team already uses
  2. Twelve weeks live

    Weeks 1–12

    • Three to five project leaders send in what happens on their sites
    • The agents handle the paperwork
    • Every week, you talk to the founders directly
  3. Results on the table

    Week 12

    • The extra work we confirmed for you
    • The agreements that are on paper
    • The hours your project leaders got back

    Measured on your own projects.

What construction companies ask us.

hello@punchlister.ai+32 456 64 66 83

Do my project leaders have to learn a new app?

Not necessarily. A voice note on WhatsApp, an email in Outlook or a report in SharePoint is enough: the agents pick it up there and deliver back to where your team already works. Anyone who wants to can use the Punchlister app.

Do the agents make up prices?

No. Max checks every extra against your quote, contract and specs and estimates it from your own rates. Prices come from you, never made up.

Which languages does it work in?

Voice notes and emails can be in Dutch, French or English.

Which tools does Punchlister work with?

With the tools your team already uses: Microsoft (Outlook, SharePoint), Google, Odoo, Robaws and WhatsApp.

Which construction companies is the pilot for?

For construction companies with revenue between €5M and €100M that want to build alongside us as design partners in 2026. Twelve weeks, with three to five project leaders, on your own projects.

What happens after the demo?

If a pilot makes sense, we set it up with you: your rules, payment terms, margins and crews, the quotes and contracts of the pilot projects, and the tools your team already uses. From then on, you talk to the founders directly every week.

Gauthier on a rooftop, with the city behind. Seppe, arms crossed, on a building site still in shell.

Talk to the founders.

Tired of extra work and agreements slipping through the cracks? Book a demo. Then we set up your pilot together.

Gauthier and SeppeCo-founders · Ghent

In the demo, we look at

  • What we would take off your project leaders’ hands, on work like yours
  • Whether a twelve-week pilot makes sense for your company
  • Your questions, answered by the people who would run it for you
Book a demo

We usually get in touch within one business day.

hello@punchlister.ai+32 456 64 66 83

Leaving your details takes a minute. No password, no installation, no credit card.